MCM #1

Public Education and Outreach

The 2017 Permit MCM #1 Requirements Flow Chart outlines what and how many outreach efforts are required under the 2017 permit for MCM #1 and outreach efforts related to TMDL and Water Quality Limited (Impaired) waterbodies.

MCM #1 Timeline (draft) - Summary of when the MCM #1 requirements need to be completed during the permit term. (Created by Owen Friend-Gray, City of Rochester).

MCM #1 Outreach Matrix

Resident and Business or Institution Audiences suggested outreach efforts for Water Quality Limited Waters (Impaired for Phosphorus and Nit) and TMDL Requirements (Bacteria and Phosphorus) - 3 messages per year.

MCM #1 – Part I Matrix  

Developer and Industrial Audience suggested New Hampshire outreach efforts - 2 messages per audience per permit term (5 years).

MCM #1 – Part II Matrix  

Resident and Business and Institution Audience suggested New Hampshire outreach efforts – with no impairments or TMDLs or miscellaneous overarching campaigns - 2 messages per audience per permit term (5 years).

MCM #1 - Part III Matrix  

Developers Resources

Description and Instructions (SOP)-Development 

Fertilizer

Description and Instructions (SOP)

Industrial Facilities Resources

Description and Instructions (SOP)-Industrial 

Pet Waste

Description and Instructions (SOP)

Septic Systems

Description and Instructions (SOP)

Outreach Tools:

EPA Septic System Outreach Materials:

Septic System Maintenance Social Media Posts

Septic System Maintenance Video to Share on Local TV Stations 

Septic System Maintenance Article

NH MS4 Efforts:

Yard Waste

Description and Instructions (SOP)

Outreach Tools:

Additional Activities and Materials